Porcelain paving is a popular choice for modern gardens and it’s easy to see why. It delivers a clean, contemporary look, performs brilliantly in the British climate and stays looking good with minimal maintenance. If you’re still weighing up your options, our guide to the reasons to choose porcelain paving for your garden explores the benefits in more detail.

While porcelain offers plenty of advantages, it isn’t laid in quite the same way as traditional concrete or natural stone paving. Its low porosity means the installation method really matters. Cut corners and problems can show up surprisingly quickly.

In this guide we cover how to lay porcelain paving slabs properly, step by step. It’s designed for confident DIYers who want a long-lasting result, as well as homeowners who want to understand what a good installation looks like before hiring a professional.

Before you start, here’s what to expect:

  • Time required: Varies depending on area size and preparation
  • Difficulty: Intermediate DIY
  • Key difference: Porcelain slabs must be fully bedded and primed to bond correctly

Follow the guidance below and you’ll avoid the most common mistakes, protect your investment and create a porcelain patio you can rely on.

 

 

What you need to lay porcelain slabs on concrete 

Before you start laying your porcelain paving slabs, make sure you have the following tools and materials ready. Having everything to hand will help the installation run smoothly and reduce the risk of mistakes.

Tools

  • Rubber mallet
  • Measuring tape
  • Spirit level
  • Hard-bristled brush
  • Tarpaulin (optional, useful if rain is forecast)

 

Materials

  • Porcelain paving slabs
  • Freshly mixed mortar
  • Slurry primer (essential for porcelain paving)
  • Jointing compound suitable for porcelain slabs

 

It’s important to remember that porcelain is a non-porous material, which means it won’t bond to mortar in the same way as other paving slabs. Using a slurry primer helps create a strong bond between the slab and the mortar bed, supporting a durable, long-lasting finish.

 

Priming your porcelain paving slabs

With your base prepared and your slabs ready, it might feel like you’re ready to start laying. With porcelain paving, there’s one crucial step to complete first.

Unlike concrete or natural stone, porcelain paving slabs are non-porous. This means they don’t absorb moisture from the mortar bed, making it harder for the slab to bond naturally. Without the right preparation, this can lead to poor adhesion over time.

The solution is simple. Before laying each slab, apply a slurry primer to the reverse side. This creates a strong bonding layer between the porcelain slab and the mortar bed, helping to maintain the long-term strength and stability of your patio.

Apply the primer evenly and lay the slab while the primer is still wet to achieve the best possible bond.

Top tip: While porcelain paving requires a little more care during installation, its low porosity is also one of its biggest advantages. Because water can’t penetrate the surface, porcelain slabs are more resistant to frost, staining and cracking over time.

Top tip: Take care not to get any primer or cement residue on the face of the slab. Once dry, it can be extremely difficult to remove and may leave permanent marks on the surface.

 

Before you lay porcelain paving 

Taking a little time to check and plan before you start laying will make the installation smoother and help avoid issues later on.

 

Check your paving slabs

Once your porcelain paving has been delivered, check the slabs carefully before installation. Set aside any slabs with chips or damage, as these can be used later for cut pieces if needed.

If possible, loosely lay out the slabs in your chosen pattern before fixing them in place. This helps you to visualise the finished patio, confirm spacing and alignment, and identify where cuts may be required.

 

Plan levels and drainage

Good drainage is essential for any paved area. Your porcelain paving should be laid with a slight fall to allow surface water to drain away naturally.

As a general guide, aim for a gentle fall away from buildings to prevent water pooling or running back towards your home. Use a spirit level or string line to check levels as you work.

 

Prepare for the conditions

Porcelain paving should be laid in dry conditions where possible. If rain is forecast, have a tarpaulin ready to protect freshly laid slabs and prevent excess moisture from affecting the mortar or joints while they set.

Taking these simple steps before you begin will help ensure your porcelain patio is laid accurately, drains effectively and performs well for years to come.

 

How to lay porcelain paving on concrete: step-by-step guide

 

Step 1. Lay a full bed of fresh mortar

Working one slab at a time, spread a full bed of freshly mixed mortar onto the concrete base. The mortar should be workable but firm enough to support the slab without slumping.

Avoid spot bedding or dot-and-dab methods. Porcelain slabs must be fully supported across their entire underside to prevent movement, cracking or long-term failure.

Top tip: Only prepare enough mortar for one slab at a time. This prevents it from drying out before the slab is laid.

 

Step 2. Prime the slab and place it into position

Before laying, apply a slurry primer evenly to the reverse of the porcelain slab. While the primer is still wet, carefully place the slab onto the mortar bed.

Lower the slab into position gently, working from one corner to the other to help control alignment and reduce trapped air.

 

Step 3. Tamp down and check levels

Using a rubber mallet, gently tap the slab into place to ensure full contact with the mortar bed. Check that the slab is level using a spirit level, adjusting while the mortar is still workable.

Achieving 100% contact between the slab and mortar creates a stronger bond and helps extend the life of your patio.

Top tip: Make all adjustments immediately. Once the mortar begins to set, repositioning becomes difficult.

 

Step 4. Maintain consistent spacing between slabs

Lay the next slabs following the same process, maintaining consistent spacing throughout. As a general guide, leave approximately a 5mm gap between each porcelain slab, regardless of the laying pattern.

If slabs need trimming to fit edges or features, cut them before moving on to the next row to keep the layout accurate.

 

Step 5. Fill the joints

Once all slabs are laid and secure, fill the joints using a jointing compound suitable for porcelain paving. Ensure all gaps are fully filled to help lock the slabs in place and reduce the risk of weed growth.

Brush away any excess jointing material from the surface before it dries.

 

Step 6. Allow the paving to cure

Leave the newly laid paving to dry for at least 24 hours before walking on it. If rain is forecast, cover the area with a tarpaulin to protect the mortar and joints while they set.

 

Planning your porcelain patio with Bradstone

For over 65 years, we’ve been helping homeowners choose paving they can rely on and providing clear, practical guidance to support every stage of their project, from preparation through to installation.

Whether you’re laying porcelain paving yourself or working with a professional installer, we’re here to help. You can browse the Bradstone porcelain paving range online or at your nearest stockist, order free samples to compare at home and, when you’re ready, find an installer through Bradstone for added reassurance with the Bradstone Assured Guarantee.

 

Frequently Asked Questions

Why do porcelain slabs need a special primer before laying on concrete?

Porcelain is a non-porous material, which means it doesn’t absorb moisture or bond naturally with mortar. A slurry primer creates a bonding layer between the slab and the mortar bed, helping to achieve a strong, long-lasting fix. Without priming, porcelain slabs are more likely to loosen over time.

Can I lay all the mortar at once before placing the slabs?

No. Mortar should be laid one slab at a time. This prevents it from drying out before the slab is positioned and adjusted. Working in small sections also helps ensure full contact between the slab and the mortar bed.

How can I ensure my porcelain slabs are laid level and secure?

Each slab should be laid onto a fresh, full bed of mortar and gently tamped into place using a rubber mallet. Use a spirit level straight away to check levels and make adjustments while the mortar is still workable. Ensuring full contact with the mortar helps create a stronger, more stable finish.

What's the recommended spacing between porcelain paving slabs? 

As a general guide, leave a gap of around 5mm between each porcelain slab. This allows space for jointing material and helps accommodate small tolerances in slab size, regardless of the laying pattern.

How long do I need to wait for the patio to dry after laying porcelain slabs?

Porcelain paving should be left to dry for at least 24 hours before walking on it. If wet weather is forecast, covering the area with a tarpaulin will help protect the mortar and joints while they cure.